Convincing, exemplary, and successful:
References from q4pm and quattron group
These examples show how q4pm’s competences and those of the quattron group are bundled into successful projects and implemented on site.
- ABS 38:
Railroad extension Munich – Mühldorf – Freilassing for DB Netz AG- > Support of the client, focus on planning phase
- > Interface management to parallel projects, authorities, and communities
- > Clarification of railways and agreements
- MDA Augsburg:
Project management mobility turntable Augsburg for Stadtwerke Augsburg- > Tunneling of Central station with linkage of the traffic trunk and tram
- > Complex interface management to parallel projects, financing bodies, approval and supervisory authorities, infrastructure companies
- NTZ ETCS:
Piloting the procedure new type approval of the Federal Railroad Office for DB Netz AG- > DB Netz AG support of first-time system approval of the new European traction control system
- > Control and scheduling 40 subprojects
- > Control and contract management of 25 external companies
- ESTW – Munich – Pasing and Gessertshausen for DB ProjektBau GmbH
- > Phase-wise upgrade of the Pasing and Gessertshausen interlocks in ESTW technology
- > Control of all trades construction and TA
- NBS / ABS Nuremberg – Ingolstadt – Munich / Knoten Ingolstadt for DB ProjektBau GmbH
- > Realization manager for the DB ProjektBau, complete reconstruction of the lot with all trades construction and TA
- > Commissioning of an ESTW as UZ and connection to BZ Munich
- Corridor A Rotterdam – Genoa: equipment German share with ETCS for DB Netz AG
- > Project control planning to upgrade the line with the new European traction control technology ETCS
- > appointment management
- > document management
- Route Basel – Muttenz:
Project management for SBB- > supplementary management and
- > financial Controlling
- AlpTransit-Gotthard:
Consultancy controlling system for ATG AG- > Consulting and support in the procurement procedure for the controlling system
- > System assessment in the market environment
- NBS Matara-Belliata, Sri Lanka:
Project control for China Machinery Corporation- > Project management for the Chinese GU CMC
- > Interface management and overall communication with the Ministry of Railways of Sri Lanka
- > Quality management and interface management to the local BÜ
- OIMC Over All Integrated Maintenance with TÜV Rheinland Shanghai for China Railway
- > Consulting maintenance Ballastless High Speed Track
- > Rail grinding consulting
- New Wuhan – Guangzhou Railway Passenger Dedicated Line * for China Railway
- > General Consulting Engineer for all trades construction and TA
- > Project management and quality management
- > Commissioning of the overall route using ESTW technology and ETCS II / CTCS III
* Info: 980 km of which approx. 165 km tunnel and approx. 430 km bridges, V = 350 km / h with superstructure fixed track in Rheda 2000